Complete refurbishment of the A2 industrial building with modernisation of air conditioning, lighting and creation of new functional spaces such as changing rooms, rest area and workshop that will support the A320 production areaSpain
Engineering and Construction Supervision of the new Taxiway for the Beluga XL at Airbus FactoryEspaña
Ingeniería para Ejecución de Plantas Fotovoltaicas en Montalto di Castro (Italia)Italy
Project for the Integration of Filtration and Purification Systems by Photocatalysis in the HVAC System of the EXPO-Building, SevilleEspaña
Adaptation of the Fire Protection Installation under the Beluga Platform Building H1.1.Spain
Biomass Steam Generation Plant at the Airbus Factory in Illescas, SpainSpain
Magnetic Levitation District Cooling for Hospital Universitario Virgen del Rocío (HUVR) in SevilleSpain
Seawater Reverse Osmosis SOUSSETunisia
Drinking Water on the east coast of Tunisia
Seawater Reverse Osmosis TAWEELAHUnited Arab Emirates
SAVENER in the Largest Reverse Osmosis Desalination Plant in the World
Seawater Reverse Osmosis DUBALUnited Arab Emirates
Avagatgarde engineering for a Process Desalination Plant in Dubai