Complete refurbishment of the A2 industrial building with modernisation of air conditioning, lighting and creation of new functional spaces such as changing rooms, rest area and workshop that will support the A320 production areaSpain
Engineering and Construction Supervision of the new Taxiway for the Beluga XL at Airbus FactoryEspaña
Project for the Integration of Filtration and Purification Systems by Photocatalysis in the HVAC System of the EXPO-Building, SevilleEspaña
Adaptation of the Fire Protection Installation under the Beluga Platform Building H1.1.Spain
Roof and Structure of Hangar E.Spain
Study and Analysis of Pathologies
Partial Interior Refurbishment of Building A in Airbus FactorySpain
Design and direction of partial interior reform works
Upgrading of Water Distribution Pipework for Airbus FactorySpain