Energy Efficiency Improvement in Non-Productive Areas of the Airbus Factory in Tablada (Seville)España
Integral Reform of the Radiodiagnosis and Magnetic Resonance Installations in the Hospital Juan Ramón Jiménez (Huelva)Spain
Annex Building for Energy and Functional Optimisation in Hangar A1 at Airbus GetafeSpain
Optimisation and Replacement of the Thermal Power Plant of the Virgen del Rocío University HospitalEspaña
Execution Project for the Refurbishment of Laboratory in D4E BuildingSpain
Complete refurbishment of the A2 industrial building with modernisation of air conditioning, lighting and creation of new functional spaces such as changing rooms, rest area and workshop that will support the A320 production areaSpain
Adaptation of the Fire Protection Installation under the Beluga Platform Building H1.1.Spain
BARKA V desalination plant basic and detailed engineeringOman
Modification of the ST35A Station in Hangar H1.2Spain