Complete refurbishment of the A2 industrial building with modernisation of air conditioning, lighting and creation of new functional spaces such as changing rooms, rest area and workshop that will support the A320 production areaSpain
Engineering and Construction Supervision of the new Taxiway for the Beluga XL at Airbus FactoryEspaña
Project for the Integration of Filtration and Purification Systems by Photocatalysis in the HVAC System of the EXPO-Building, SevilleEspaña
Adaptation of the Fire Protection Installation under the Beluga Platform Building H1.1.Spain
BARKA V desalination plant basic and detailed engineeringOman
Water recycling by Reverse Osmosis at CEPSA RefinerySpain
Modification of the ST35A Station in Hangar H1.2Spain
Biomass Steam Generation Plant at the Airbus Factory in Illescas, SpainSpain
Magnetic Levitation District Cooling for Hospital Universitario Virgen del Rocío (HUVR) in SevilleSpain
Seawater Reverse Osmosis DUBALUnited Arab Emirates
Avagatgarde engineering for a Process Desalination Plant in Dubai