The construction works for the new Warehouse of the Airforce Maestranza of Albacete are at a very advanced stage. This Project was designed by Savener in the year 2016 and represents a very important improvement in the Logistics of military warehousing within the Airforce Maestranza of Albacete.
After the tender process, at national level, the works were awarded to the Cobra Group. Works carried out so far by Cobra Group, under the supervision of Savener’s team, have proceeded smoothly and on time. To date the structural stage has been completed and the facade panels are now being placed together with the finishes and fixtures. Over the next few weeks all interior finishes and shelving will be completed, and services connected, after which materials will be transferred and the new stage of refurbishment of other warehouses in the proximity of the newly-built one will commence. All work is carried out according to quality standards and under the control and supervision of our technical team, in a constant effort to maintain the integrity of the original project.